Construction Submittal Process: Steps, Roles and Tracking

Contractor and designer review a submittal package

The construction submittal process is how a contractor proves, before any work starts, that the materials, equipment and methods it plans to use match the design. The contractor builds a package, checks it, sends it to the architect or engineer, and waits for an action: approved, approved as noted, revise and resubmit, or rejected. Then the approved version goes to the people who install it. This guide walks through each step, who owns it, and how to keep the paper trail clean.

Construkt
Keep Field Records Connected
Organize project photos, tasks, notes, and location data in Construkt, then compile them into client-ready PDF reports.
Explore Construkt

TL;DR

  • A submittal is evidence of compliance: shop drawings, product data, samples, mockups, test reports and similar items reviewed before fabrication or installation.
  • The core flow is: plan the submittal list, prepare, contractor review, design team review, action, resubmit if needed, distribute, close out.
  • Submittals answer “does this product meet the spec?” while RFIs answer “what does the document mean?” Mixing them up costs time.
  • Delays mostly come from a missing log, unclear ownership and approved documents that never reach the field. A simple, shared record fixes most of it.
  • Capture field proof (photos, notes, locations) in the same place as your project records so installed work can be matched to what was approved.

Table of Contents

What a construction submittal is and why it exists

A submittal is information the contractor gives the design professional so materials and equipment can be approved before they are fabricated and built into the project. Allensworth describes it that way and notes that contract documents often require the contractor to provide a coordinated submittal schedule.

The purpose is verification. The Montana Department of Transportation states that submittals verify that proposed materials, equipment and methods comply with design requirements, specifications and contract documents before physical work begins, and that they support inspection and the materials certification process.

The AIA adds a practical angle: submittals help confirm compliance, reduce coordination issues and surface discrepancies early. Finding that a window assembly does not match the spec on paper costs an email. Finding it after installation costs a tear-out.

What goes into a submittal package

The specification sections tell you exactly what each trade must submit. Common types include:

  • Shop drawings. Under the AIA A201, these are drawings, diagrams, schedules and other data specially prepared for the Work that show how the contractor intends to fabricate, assemble and install a portion of it. Think steel connections, millwork, ductwork layouts.
  • Product data and cut sheets. Manufacturer literature showing performance, dimensions, finishes and ratings for the exact model proposed.
  • Samples. Physical examples of materials, equipment or workmanship that set the standard the work will be judged against. The AIA lists finish samples, material boards and window assemblies as examples.
  • Mockups. Built examples such as an exterior wall section or a flooring installation, reviewed on site.
  • Test reports and certificates. Lab results, third-party certifications and similar proof.
  • Design data and calculations. Engineering calculations for items the contractor designs, such as certain structural or fire protection components.
  • Qualification data. Installer or manufacturer credentials the spec requires.
  • O&M data and closeout submittals. Operation and maintenance manuals, warranties and as-built information delivered at the end.

A good package is complete the first time. Label it with the spec section number, the project name, the subcontractor, the date and a unique submittal number, and mark the exact product options being proposed (cut sheets often cover a whole product family).

The construction submittal process, step by step

Exact procedures vary by owner and contract, but the sequence below is consistent across public and private work. Public agencies such as Michigan DOT publish their own review workflows, so always check what your contract requires.

1. Build the submittal list

Before work starts, read the specifications and list every item that requires a submittal: the section, the type, the responsible subcontractor and the date approval is needed. This is your submittal log. A/Z’s standards manual describes the goal as a standardized, systematic approach covering identification, review, approval, tracking and archiving aligned with specifications and schedules.

Work backward from the install date. If ceiling tile must be on site in week 14 and lead time is six weeks, approval is needed before week 8, which means the package goes out well before that to leave room for review and a possible resubmittal.

2. Prepare the submittal

The subcontractor or supplier gathers drawings, data and samples against the spec section. Check the requirements line by line: finish, rating, size, color, warranty term. Highlight compliance points so the reviewer does not have to hunt.

3. Contractor review

The general contractor does not simply forward packages. The contractor is expected to review for compliance with the contract documents and approve before sending to the design team. LegalClarity summarizes this duty and ties it to AIA A201-2017 Section 3.12.5. Check for completeness, coordination conflicts with other trades and consistency with the drawings.

4. Transmit to the architect or engineer

Send the package with a transmittal that identifies it, notes the review period the contract allows, and records the date it left your hands. Log the date. Many disputes about delay come down to when something was actually sent and received.

5. Design team review and action

The architect and consultants review for conformance with design intent. Typical actions include approved, approved as noted, revise and resubmit, and rejected. A “revise and resubmit” covers issues that prevent approval and require resubmission, while “rejected” is for a submittal that is fundamentally noncompliant.

On agency projects the review can involve several technical groups. In Michigan DOT’s shop drawing workflow, reviewers add comments while the file is in review, a coordinator consolidates them, and the file is then stamped and moved to an approved or rejected folder, with the original comments kept as a project record.

6. Resubmit if required

Address every comment and say how you did. Increment the revision number so nobody builds from an outdated version. Keep the earlier version and the reviewer’s comments attached to the record.

7. Distribute the approved version

Approval means nothing if the foreman is working from last month’s drawing. Send the approved set to the subcontractor, the purchasing team and the field crew, and tell them which version supersedes which. A common routine is to file approved items and notify the subcontractor the same day, as outlined in one document control workflow guide.

8. Order, install, verify and close out

Only now does fabrication or purchase proceed. During installation, compare what arrives and what goes in against the approved submittal. At the end, closeout submittals such as O&M manuals and warranties are collected and archived for turnover.

Who does what

Role Main responsibility in the submittal process
Subcontractor or supplier Prepares the package against the spec section and responds to comments
General contractor Maintains the log, reviews for compliance and coordination, transmits, distributes approved copies
Architect or engineer Reviews for conformance with design intent and issues the action
Specialty consultants Review items in their discipline, such as structural, mechanical or electrical
Owner Receives closeout documents; may review select items such as finishes
Field supervisor or foreman Installs to the approved version and flags mismatches

On federal work the roles can be more formal. The US Army Corps of Engineers’ submittal playbook describes a QC Manager who performs submittal review and approval, and says some contracts also call for an assistant QC manager, a submittal clerk or QC specialists who certify that their area’s submittals are complete before they go to the government.

Submittals vs. RFIs

The two documents travel the same route and are often confused. A submittal says “here is what we propose to install, please confirm it meets the requirements.” An RFI says “this document is unclear or conflicting, please clarify.” LegalClarity draws the same line: an RFI clarifies, while a submittal proves compliance for review before procurement.

In practice, a submittal review can generate an RFI (the spec calls for a product that no longer exists) and an RFI answer can change what must be submitted. Keep them in separate logs but cross-reference by number. Sending a question as a submittal comment, or a product proposal as an RFI, sends it to the wrong queue and burns review time.

Submittals vs. RFIs

How to track status, comments and revisions

A submittal log is the backbone. At minimum track:

  • Submittal number, spec section and description
  • Responsible party
  • Date due to design team, date sent, date returned
  • Action taken and revision number
  • Required-on-site date, so you can see float disappearing

Review it regularly. The Army Corps playbook requires each contractor’s quality control program to address submittal review and approval, including checking status at weekly QC meetings and keeping submittal records at the project site. Private projects benefit from the same habit: a 15-minute weekly look at everything overdue or approaching its need date.

Correspondence matters too. Penn State’s construction management text notes that emails, notes and letters need to be captured and archived so they can be searched later, ideally by sending them to a shared system rather than one person’s inbox. Review comments sent by email belong in the submittal record.

Practices that prevent delays

  1. Start the log at kickoff, not when the first sub asks. The earlier long-lead items are identified, the more review time you can build in.
  2. Review before you forward. A package sent to the architect with an obvious omission will come back, and the clock restarts.
  3. Be specific in transmittals. State the spec section, what is being proposed and any deviations from the spec you are asking the team to consider.
  4. Assign one owner per submittal. Shared responsibility becomes nobody’s responsibility.
  5. Record every date. Receipts, returns and resubmittals are your evidence if a schedule claim arises.
  6. Archive consistently. A standard folder and naming convention beats clever systems. A/Z’s manual presents standardized tracking and archiving as a way to enhance coordination, minimize delays and support closeout.
  7. Close the loop in the field. Make the approved version easy to open on a phone, with the previous one clearly marked superseded.

Connecting submittals to what happens on site

Most guides stop at the stamp. The field side is where approved submittals either hold up or get ignored. Three habits help.

First, photograph deliveries and installed work against the approved item: product labels, batch numbers, the mockup, concealed conditions before they are covered. Timestamped and location-tagged photos filed to the right project make it simple to show that what went in matches what was approved. For a deeper look at what field photos should capture, see this overview of photo documentation field rules for construction projects.

Worker photographs an installed fire door label

Second, tie follow-ups to tasks. If a submittal comes back “approved as noted,” the note becomes a task for the person who orders or installs the item. Our construction task management page shows how that kind of assignment works on a phone.

Third, keep the daily log honest. Record when a mockup was reviewed, when a delivery arrived and any substitution discussions. A construction daily log that lives with the photos and drawings is far easier to defend than reconstructed memory.

For teams who want records for all of this in one place, our guide to construction document management and our field-first look at construction data cover how to organize it.

Perspective

We built Construkt around one observation: the paperwork that protects a contractor is usually created in the field, in a hurry, with dirty hands. A submittal can be perfectly approved in the office and still fail the project if nobody can show what was delivered, where it was installed and when.

That is why we focus on the field half of the process. Photos land in the right project automatically, with timestamps and GPS coordinates when available. Capture works offline and syncs later, because basements and rural sites do not wait for signal. Daily logs, tasks, drawings and floor plans sit beside those photos, and our reports turn them into a client-ready PDF you can send by email, Google Drive or WhatsApp.

Our view is that a submittal process only works if the approved information and the proof of installation live in the same record. Large controls and a simple workflow are not decoration; they are what makes a crew actually use the system on a Tuesday afternoon with a deadline.

Yahya

Put your field records in one place

If your submittals are approved but your site photos, notes and tasks are scattered across phones and chat threads, Construkt gives you a single, organized record. Photos are filed to the right project with timestamps and GPS when available, and reports compile photos, tasks, materials, notes and location data into a PDF you can share with the client.

Construkt

Plans are published on our pricing page: Free at £0 per month, Solo at £5.98 per month, Team at £10.25 per month and Enterprise at £21.36 per month. You can also see how our construction approval workflow page and reporting tools fit into your project routine, or start from the Construkt home page.

FAQ

How long does submittal review usually take?

The contract sets it. Many specifications state a review period, so read yours and build it into the schedule along with time for a possible resubmittal. Work backward from the date the item is needed on site, and send long-lead items first.

Who is responsible for approving a submittal?

Two parties act in sequence. The contractor reviews the package for compliance with the contract documents and approves it before transmitting. The architect or engineer then reviews for conformance with design intent and issues the formal action. Agency projects may add QC staff or technical review groups.

What is the difference between a submittal and an RFI?

A submittal proposes specific products, drawings or samples for approval before purchase or fabrication. An RFI asks for clarification of unclear or conflicting contract information. Track them separately and cross-reference them when one affects the other.

What happens if a submittal is rejected?

A rejected submittal is fundamentally noncompliant and must be replaced with a new proposal. A “revise and resubmit” action asks for specific corrections. In both cases, update the revision number, answer every comment and keep the earlier versions in the record.

What should I do with approved submittals?

Distribute them to the subcontractor, purchasing and the field crew, mark the superseded versions, and archive them in a consistent location. In the field, keep the approved version available on a phone so installed work can be checked against it.